About
25 Years Experiance Building work as Bathroom Refurbishment. No job to big or to small. Long Warrantee with every job done. High Quality Finish. Job done within buget. Always meet customer's all expectation. Satisfaction Guaranteed.
References on request.
Good to know
ID checked
Credit checked
Address checked
Fraud checked
20+ ratings
Member for 7 years
Work area
Map loading...
Trades & services offered
Bathroom fitter
Primary tradePlumber
Reviews & ratings
Bathroom Installation
First class job by a first class tradesman Nothing was a bother & done other little jobs as well Was well presented & well spoken with an excellent attitude
Complete Bathroom Refurbishment
Job: fit new bathroom, tiles, plumbing etc Fired him after 3 days because; - did 12 hours work in 3 days achieving very little - removed a stop end then turned the mains on so water pouring through ceiling - claimed material availability was causing delays (we've had no difficulty sourcing anything) - newly drilled soil pipe hole is too small for standard fitting. -wanted to put waste from another job in our skip The list goes on. Only benefit, forcing us, out of necessity, to learn basic plumbing skills
- TRADESPERSON, 6/07/2020 13:41
Feedback completely untrue and unfair. The job was in schedule. Looks like little achievement. It's happening at the beginning of the job. But is essentially to spend any time needed with every step of the job in order to achieve high quality finish. I have 25 years experience doing bathroom refurbishment. I never had complaints. I have very good reputation doing bathroom refurbishment that it was build up in years, not over night. It wouldn't been go over the estimated time. You shouldn't be cancelling the
- TRADESPERSON, 6/07/2020 13:44
You shouldn't be cancelling the project as it was price job not daily rate. Look at other feedbacks . I would definitely finish the job in time at the high quality finish. It is what I do with every single job.The soil pipe is standard 110mm as should be. About the waste...i was asking your husband permission to drop it in the skip...i was offering to pay for, I didn't ask for free. I didn't take advantage of you in any way. It was your decision to cancel the job.
- TRADESPERSON, 6/07/2020 13:46
Good luck and I hope you will be able to complete the project at your expectation.
- HOMEOWNER, 8/07/2020 07:41
If you can work 12 hours in 3 days and still finish the job on time you don't need 2 weeks (we were living with a portaloo and no shower). You lied about material availability delaying the job. You came to a shell of a room with full access. While a soil pipe is 110mm the outside diameter of the collar for the connector to the soil stack is at least 124mm depending on type. The 115mm hole drilled means the soil stack has to be moved or offset significantly from the wall or bricks out chipped out (ugly).
Complete Bathroom Refurbishment
Excellent. a top rate plumber, perfectionist, well mannered, we will most definitely ask him to do any work for us again.
Bathroom Installation
I would not hesitate in recommending Chris after he fitted our shower room. He is very reliable, a perfectionist and great value for money! We were so pleased with his work we have asked him to come back and refit our second bathroom!
Complete Bathroom Refurbishment
Chris Carried out a shower room refit for us. He has great attention to detail. He was always open to discuss and carry out the changes we requested mid project. A nice tidy job that gets great comments from all that have seen it. Would definitely recommend.