jagdis kikabhai

Bolton

full starfull starfull starhalf star
Good1ratings

Post your job for free. Get quotes. Read reviews.

Good to know

Verified ID icon

ID checked

Verified Credit icon

Credit checked

Verified Address icon

Address checked

Verified Fraud icon

Fraud checked

Work area

Map pin icon

Map loading...

Trades & services offered

Bathroom fitter

Bath Resurfacing
Bathroom Installation
Bathroom Tiling
Wet Room Installation

Floor fitters

Vinyl Flooring
Water Underfloor Heating

Gas / Heating engineer

Electric Boiler - Repair
Electric Boiler - Service
Electric Boiler - Service / Repair
Gas Boiler - Installation
Gas Boiler - Repair
Gas Boiler - Service
Gas Boiler - Service / Repair
Gas Cooker / Hob - Repair
Heat Pump (Air source/ Ground Source)
Hot Water Tank/Appliance Tank Thermostats
Radiator
Solar Panel Installation
Water Underfloor Heating

Painter and decorator

Door / Window Painting
External Wall Painting
Internal Painting & Decorating
Mould / Damp Control
Wall Murals / Paint Effects

Plumber

Bathroom Installation
Bathroom, Kitchen and WC Plumbing
Emergency / 24 Hour Plumber
Emergency Plumbing - Water
Guttering and Rainwater Pipe
Hot Tub Installation / Repair
Plumbing Repair & Maintenance
Power Showers and Pump
Radiator
Solar Panel Installation
Sprinkler System
Water Tanks and Immersion Heater
Water Underfloor Heating

Roofer

Guttering and Rainwater Pipe
Roof Cleaning
Roof Insulation

Specialist Tradesperson

Water Underfloor Heating

Traditional Craftsperson

Wall Murals / Paint Effects

Reviews & ratings

full starfull starfull starhalf star
Good1ratings
5
full star
0
4
full star
1
3
full star
0
2
full star
0
1
full star
0
full starfull starfull star
Verified

Bathroom, Kitchen and WC Plumbing

The floor tiles were not positioned by staggering as originally agreed. The wall tiles had excess grout left on them which I have had to spend number of hours cleaning of & this is still not complete. The basin does not sit level on the vanity unit, a family member has removed the basin and it in the midst pof cutting a bigger hole. Really disappointed with the overall finish.

  • TRADESPERSON, 19/11/2013 22:06

    Tiles were positioned as agreed with customer. After I grouted I cleaned all excess grout off. The basin is a counter top basin, so it sits on top. The hole made by myself is big enough for the waste. Checked with customer when finished if they were happy with the work, customer was happy and paid me in full.